CPHI Middle East · Riyadh

Your stand at CPHI Middle East.

Stands for pharma and manufacturing companies: quiet meeting spaces, organised product display and a clear scientific identity.

Get a quotation for your boothWhatsApp us

CPHI visitors are buyers and specialists who came to do business, not to take photos. So we design the stand around meetings: quiet rooms or lounges, a clear display of products and certifications, and a path that gets interested visitors to your sales team fast.

Dates14–16 December 2026
VenueRiyadh Exhibition & Convention Center – Malham
SectorPharmaceuticals
Official siteVisit website ↗

We produced the Siemens Healthineers opening in Riyadh and stands at World Defense Show and INDEX, and we understand the precision healthcare brands expect.

What we deliver
  • 01Booth concept and floor plan based on your goals and stand size
  • 02Photorealistic 3D visuals before fabrication
  • 03In-house carpentry, metalwork, print and finishing
  • 04Lighting, LED screens and interactive elements
  • 05Organiser approvals, logistics and on-site supervision
  • 06Installation, maintenance during the show and dismantling
CPHI Middle East

What your booth needs.

01Meeting spaces

Lounges or a semi-closed meeting room to discuss contracts privately.

02Organised product display

Display units for samples and packaging with clean lighting.

03A clear scientific identity

Graphics that explain products, certifications and plants in few words.

04Practical hospitality

A reception counter and small coffee point that keep key visitors longer.

How we work

Suggested preparation timeline.

Counted back from the opening day.

  1. Brief and concept start

    Stand size and number, goals and budget. Initial proposal within 48 hours.

  2. 3D design approval

    Layout, visitor flow, final renders and materials.

  3. Organiser submissions

    Technical, structural and electrical drawings per the exhibitor manual.

  4. Fabrication in our factory

    Carpentry, metalwork, print and finishing with quality checks before shipping.

  5. Build-up and show days

    Installation in the organiser's build-up slots, on-site support, then dismantling.

Selected projects

Selected projects.

Real projects designed and built by our team.

Siemens Healthineers opening
Siemens Healthineers opening
Bin Shihon · World Defense Show
Bin Shihon · World Defense Show
The Business Code · INDEX
The Business Code · INDEX
Fabricated in our factory
Fabricated in our factory
FAQ

Frequently asked questions.

When should we start a CPHI stand?

Ideally three to four months before the show, to finish design, approvals and fabrication without pressure.

Can you build meeting rooms inside the stand?

Yes. We design closed or semi-closed meeting rooms depending on space and organiser rules.

Do you handle organiser approvals?

Yes. We prepare technical drawings and documents and coordinate build-up and breakdown.

How much does a CPHI stand cost?

It depends on size, materials and screens. Send us your stand size and number and we reply with an itemised quotation within 48 hours.

FREE GUIDE · PDFExhibitor Guide 2027: 16-week plan and stand checklistDownload the guide
Get a quotation

Tell us about your project.

Share the details and a project manager will contact you within one business day, with an initial concept and quotation within 48 hours.

Unified number9200 329 16

Trusted by 38+ brands · Our factory is in Riyadh · Delivering across Saudi Arabia

Project type